The 60-Day Window Closes. Did the Number Move?
We scope every portal against one number. Time-to-spray-card. Documentation time per session. Authorization denial rate. Before the build starts, we name the baseline and set a 60-day target. The first module's job is to move that number.
Sixty days after rollout, you read the result. This is the measurement moment most portals skip, because most portals never set a measurable target in the first place. Here is what we look for.
The number moved. If it hit or passed the 60-day target, the system worked. The spray card generator at Freedom Ag dropped time-to-card from 15-20 minutes to under two. That is the KPI, confirmed. The next conversation is about the second module, which emerges from real use rather than from the original scoping session. The team has been running the tool for 60 days. They know what is still slow. That brief belongs to them, not to us.
The number did not move. Two causes, different fixes.
The first is adoption: the tool exists, the team is not using it. This is almost always a design problem that surfaced during rollout and was not fully resolved before the deployment went wide. The pilot user knew which inputs to trust and which to review carefully. The rest of the team did not, and nobody told them. If the system is not being used, measuring whether it works is measuring nothing. Fix the adoption first, then restart the window.
The second is implementation: the team is using the tool, the number is still not moving. This is rarer but more diagnostic. It usually points to one of three things: the scope was wrong (the KPI is downstream of a process the tool does not touch), the data was incomplete (the tool is working but source records are missing), or the baseline was wrong (the original time estimate was generous, and the actual gain is real but smaller than the stated target). Each has a different answer.
The number moved, but only for some users. This is the most common outcome at 60 days. Two or three people are fast with the tool. The others are still doing the task the old way, or only using the tool sometimes. This is the design problem from the rollout that did not get fully fixed before scaling. The pilot user's implicit knowledge is still not visible in the interface. At this point the 60-day target becomes a team adoption target, not just a tool capability target, and the work is in the interface, not in the underlying system.
What you do with the result. A moved number is the case for the second module. The first module proved the system can deliver. The second module is proposed by the team because they have lived with the tool for 60 days and they know what to fix next. A number that did not move is a diagnosis exercise before anything else ships.
The 60-day window is a forcing function. It produces a verdict based on actual outcomes instead of projected ones. That is why we set a measurable target before the build: so there is something real to read when the window closes.